Pick an installation type — we fill appliances, voltage, battery chemistry and run the schematic calculation.
Scales phone charging (10 W × person · 1 h/day) and lights (10 W + 10 W × person).
Inverter / voltage converter selection
Recommended inverter: 3000 W (Continuous: 2647 W, Peak: 4235 W)
Inverter operating mode
Inductive loads (2× surge): Indukční deska
Inverter idle self-consumption
40 W × 4 h/day = 160 Wh/day
Inverter no-load self-consumption (idle consumption)
Load concurrency matrix (simultaneity factor)
Concurrency OKConcurrency factor 1 · connected 1800 W / inverter 3000 W
Sum of 230 V appliances is within continuous inverter power — unrestricted concurrent use.
Daily Consumption
1833 Wh
76.4 Ah/day
Battery Autonomy
2.4 d (57 h)
Target 2 d · 200 Ah
Max Peak Current
226.9 A
Battery bus worst-case
Battery ↔ Busbar
50 mm² · 200 A Class T
Busbar ↔ Inverter
50 mm² · 200 A Class T
MPPT ↔ Battery
4 mm² · 25 A ATO
Enter your existing inverter rating and an appliance — see the verdict and what to change.
No — changes requiredInverter OK
Existing 3000 W covers the 1200 W appliance.
Concurrency OK
Sum of 230 V loads does not exceed inverter 3000 W.
Battery too small
At 5 h/day you need ≥ 787 Ah (have 200 Ah, 8491 Wh/day).
After check: 8491 Wh/day · min. battery 787 Ah
Blueprint page preview (locked)
Cropped teasers only — full terminals, gauges and fuses unlock after purchase.
Connection schematic
2 / 5
Wire schedule From→To
3 / 5
Premium engineering audits included in the PDF
DC-DC alternator charging & idle overload protection
Full input/output sizing for voltage conversion (e.g. 12V alternator → 24V traction). Safe D+ sense wiring for Euro 6 smart alternators and idle overload protection.
230 V shock protection & N-PE bonding (IEC 60364)
Inverter grounding-relay wiring and chassis ground placed after the shunt so the RCD/RCBO works without floating chassis voltage.
Enclosure thermal audit & ventilation m³/h
Dynamic heat-loss sum from inverter, MPPT and DC-DC at full load (estimate: 317 W). Exact ventilation airflow in m³/h to protect cells from degradation.
Global & seasonal solar analysis (4 seasons by world destination)
Detailed energy production matrix (Spring, Summer, Autumn, Winter) for the selected world destination, including southern-hemisphere calendar alignment. Battery sizing for overcast days and DC-DC booster drive-time to bridge the deficit.
Workshop print pack: cable labels & CSV BOM
Cut-out cable wraps for lamination (gauge, voltage, protection) + one-click CSV BOM for material ordering.
Basic calculation (free)
Wiring Blueprint & Installation Guide (PDF + CSV)
Per ISO 10133 and IEC 60364
Complete Wiring Blueprint
€12
One-time · PDF + CSV · no account needed
Payment is charged in CZK (290 Kč).
By submitting and downloading you acknowledge the informative and advisory nature of this documentation.
Instant generationSecure payment
By submitting and downloading you acknowledge the informative and advisory nature of this Technical Installation Concept.
Engineering Health Check
Safety audit per ISO 10133 / IEC 60364-7-721 / ABYC E-11
OK: 6 · Advisory: 2 · Hazard: 2
Voltage drops compliant
Round-trip DC drop meets Victron / ISO criteria.
BMS discharge overload
Peak 227 A exceeds BMS 200 A — raise voltage or parallel packs.
MPPT frost over-voltage
Voc reaches 111.7 V at −15 °C, exceeding the controller limit (100 V). Use a more parallel layout or a higher MPPT Voc series.
Inverter thermal clearance
Keep ≥ 100 mm free air above/below high-power inverters.
230 V concurrency OK
Sum 1800 W ≤ continuous inverter rating 3000 W.
Fuse coordination OK
OCPD ≤ cable ampacity; Class-T / high-AIC MEGA for LiFePO4 (high prospective short-circuit current).
Battery fuse distance
Battery↔bus run 0.50 m > ISO 10133 max 0.2 m — place Class-T ≤200 mm from + post.
Pre-charge resistor recommended
Inverter 3000 W ≥ 2000 W — limit inrush into BMS FETs/contactors.
Cloud projects need Supabase configured.
System engineering audit
Algorithmic IEC / ISO standards check — deterministic safety validation from your inputs. No generative models.
24V LiFePO4 off-grid draft Loads (4): Kompresorová lednice (DC): 60 W × 8 h/day; Indukční deska (AC): 1800 W × 0.5 h/day; Nabíjení mobilů (DC): 20 W × 1 h/day; Světla (DC): 30 W × 5 h/day Daily energy: 1833 Wh/day (76.4 Ah) Battery: 200 Ah LiFePO4 @ 90% DOD · target autonomy 2 d · installed autonomy ~2.4 d Solar: 800 Wp · MPPT ≥ 23.6 A / Voc≤ 125.1 V Peak bus current: 226.9 A Distances: Bat↔Bus 0.5 m · Bus↔Inv 1.5 m · MPPT↔Bat 2 m Cables: Battery ↔ Busbar: 50 mm², 200A Class T | Busbar ↔ Inverter: 50 mm², 200A Class T | MPPT ↔ Battery: 4 mm², 25A ATO
No advisories.
Complete Wiring Blueprint
€12
One-time · PDF + CSV · no account needed
Payment is charged in CZK (290 Kč).
By submitting and downloading you acknowledge the informative and advisory nature of this documentation.